Oakley Culvert Access bridge

New Access Bridge & Culvert Creation

Location: Buckinghamshire

After months of paperwork and drawings going back and forth to the council, we have finally managed to be able to start works on the new culvert bridge and updating access into a field.

Being done in at the wettest time of the year meant that there was a lot more water in the existing ditch that we would have liked but with pumps getting the water out, we have managed to get the culvert in place, the sandbag headwall in and the concrete was laid. The kerb sets went in later one afternoon that week and the concrete base layer was laid.  We then had a local contracting tarmac firm come in to lay the tarmac for us. We have stock fenced around from the existing fence and have hung a new metal gate in position for security. We have now finished this job as per all the drawings and plans which the council have approved. It’s made a really smart and safe access into the field off the road.

We are fully street works accredited so if you have any accesses, you need updating, please get in touch.

Share this post